Quantcast

Jewish Journal

JewishJournal.com

June 27, 2012

Nissan Leaf Fast Charger Comes to Los Angeles

http://www.jewishjournal.com/blog/item/nissan_leaf_fast_charger_comes_to_los_angeles_20120627/

Photo

The 480v charger at The Toy Factory

Los Angeles finally has its first fast charger for electric vehicles.

The 480-volt charger is located in the parking lot across from the Toy Factory Lofts downtown, along with a bank of ten 220-volt chargers. 

For Nissan Leaf drivers like me—and Tesla drivers like Arnold Schwarzenegger—this means you can plug in and go from 0 to 100 percent charge in 30 minutes. The more common 220 volt chargers take about 8 hours for a full charge, and regular household current takes 14-16 hours.

This is the first fast-charger in Los Angeles, and the ninth in California.

Len Hill and Yuval Bar-Zemer, partners in Linear City development company, installed the chargers at the Toy Factory, a former warehouse built in 1924 by the land development arm of the Atchison and Topeka Railroad.  Later it served as a toy factory.  In 2004, Linear City, which also developed the Biscuit Company Lofts, converted the space in 121 condos.

The charging stations are one more amenity to a development that includes, “a market, restaurant, gym, art gallery, chocolatier, clothing stores, yoga studio, roof-top pool with infinity viewing deck, cabanas and fireplace, lower roof garden with innovative planting arrangements and a stainless steel barbeque, oversized hallways, a chic lobby enclosing a unique shipping container mail room, and three levels of interior parking.”

I called Bar-Zemer, who told me that he drives a Nissan Leaf, and has been looking for ways to add “green” and convenience to the company’s projects.  He enabled residents to install raised bed gardens, as well.

(Foodaism plus: Linear City also owns Church & State restaurant and Little Bear.)

More details: Ecotality installed the chargers, and users must sign up for a Blink card in order to operate them.  Right now you can juice up for free, but soon Bar-Zemer told me he expects the cost will be one dollar per hour for the 220v and a flat fee for the 480v.

The Jewish Journal will be doing a longer story on Hill and Bar-Zemer, who ALSO produced the indie comedy “Dorfman,” winner of Best Comedy at the 2012 Los Angeles Jewish Film Festival.

I’ve had a year of headaches and range anxiety over charging my Leaf, but at least now I know I can get a full, fast charge downtown.
 
The Toy Loft is at 1855 Industrial Street, Los Angeles 90021

Here’s a list of 480v Nissan Leaf Chargers in California:


1. May 2010, Vacaville, Eaton brand - PGE (public utility) open to public March 2011 only, free then, now private

2. Spring 2011, Cypress, Eaton brand - Mitsubishi (auto manufacturer) open to public, free

3. Fall 2010, Sacramento, AeroVironment brand - Nissan (auto manufacturer), private

4. March 2012, San Bernadino, Eaton brand - 7-11 store (retail public, private capital funds), public, free

5. April 2012, San Diego, JFE brand - SDG&E (public utility) private

6. April 2012, Palo Alto, unknown brand - 350green (retail public, public/private funds) public, fee

7. May 2012, Belmont, Blink brand - Volkswagon Tech Center (private / public funding) free

8. May 2012, San Ramon, Blink brand - (public / private funding) free

9.. June 2012, Los Angeles, Blink brand. Toy Lofts, downtown

JewishJournal.com is produced by TRIBE Media Corp., a non-profit media company whose mission is to inform, connect and enlighten community
through independent journalism. TRIBE Media produces the 150,000-reader print weekly Jewish Journal in Los Angeles ā€“ the largest Jewish print
weekly in the West ā€“ and the monthly glossy Tribe magazine (TribeJournal.com). Please support us by clicking here.

© Copyright 2014 Tribe Media Corp.
All rights reserved. JewishJournal.com is hosted by Nexcess.net
Web Design & Development by Hop Studios 0.3268 / 49